
Bathroom Reset – Rhinebeck, NY
Select Area
Client Review
Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.
Client Name

Project Overview
Dec 20, 2020
Jan 15, 2021

Select Below To View Areas


HardieBacker

Red Guard waterproofer

Repairs
21 point inspection
Installation
Trim & Moldings
Appliance Installation
Backsplash installation
Taping
Painting
Flooring
Countertops
Cabinetry
After Media
Before Media
Progress Media

Project Notes
📸 These photos show:
The before-and-after of floor and wall tile replacement
Subway tile tub surround with precise grout alignment
Wainscoting detail wrapping the perimeter
Vanity and lighting installation matching client’s design vision
Vent fan/light combo and finished paintwork enhancing brightness
This project was as much about collaboration as construction — taking a homeowner’s dream and executing it down to every edge and seam.
Preventative Care – Do’s & Don’ts
✅ Do:
Use pH-balanced tile cleaner to preserve grout and finish
Keep fan filters clean to maintain proper air circulation
Refresh caulk lines annually to prevent moisture penetration
🚫 Don’t:
Use abrasive scrubbers on patterned tile
Paint over moisture-affected areas without addressing the source
Ignore subtle grout discoloration — it signals water intrusion early
Other Projects

.png)



