Bathroom Renovation in Highland, NY
Select Area
Client Review
Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.
Client Name

Project Overview
Jul 25, 2022
Jul 29, 2022

Select Below To View Areas


3"x6" subway tile

Framing
Repairs
Drywall Repairs
Installation
Trim & Moldings
Appliance Installation
Electrical
Plumbing
Backsplash installation
Taping
Painting
Flooring
After Media
Before Media
Progress Media

Project Notes
📸 These photos show:
Subfloor reinforcement and leveling in the toilet zone — no more rocking, no more hidden rot or bounce
Plumbing stripped out and corrected, with clean PEX runs, secure shutoffs, and tight joints
Old framing pulled, replaced, and beefed up for a rock-solid backer board install
HardieBacker installed on all wet wall areas, then vertical gray subway tiles laid from floor to ceiling, adding a modern vibe and elongating the space
Existing toilet and new vanity installed with proper sealing and caulk — no leaks, no loose fixtures
Drop ceiling replaced with new grid and tiles, then full repaint for a bright, seamless finish
Every shortcut or “temporary” fix from the last round of repairs was eliminated. What’s behind the walls is now as strong as what’s on the surface. This is a small bathroom, but it’s got a complete, well-built backbone now.