Project Overview

Dec 23, 2019

Aug 12, 2020

🩺 Patient: Historic spiritual center with multi-phase roof deterioration across gambrel, mansard, and dormer features. Referred by: Building manager after chronic leaks, visible shingle loss, and failing cedar siding exposed deeper systemic failure. 🤕 Symptoms: -Water infiltration at multiple transitions: gambrel slopes, mansard returns, and dormer cheek walls. -Rotten decking hidden beneath shingle layers, with underlayment improperly installed or missing altogether. -Aging cedar shake siding on dormers curling and shedding. -Patchwork metal flashing that was insufficient and improperly sealed. -Failing gutter system allowing water to back up against eaves and wall lines. 🧠 Diagnosis: This wasn’t just a roof issue—it was a preservation issue. The building’s architectural charm was being compromised by decades of shortcut repairs and surface-level fixes. Dormers, with their vulnerable angles and complex transitions, had become water traps. Improper flashing and the absence of a breathable but waterproof underlayment created internal rot and systemic vulnerability. This project had to do more than “stop the leaks.” It had to respect the original character of the building while bringing it into modern standards for protection and longevity. 🛠️ Treatment Plan: Phase 1 (East End): -Full tear-off down to deck on gambrel, mansard, and dormer zones (2000 sq ft) -CDX plywood installed over existing decking for structural stability, staggered and rafter-fastened -Polyglass ice & water shield applied to 100% of roof surface -Drip edge and rake trim installed for sharp water channeling -Owens Corning Duration shingles with SureNail installed to manufacturer spec -Custom aluminum flashing bent to tuck cleanly behind drip edge and cover exposed nail lines -Cedar shake siding restored on all 3 dormers after vapor barrier install -NeverLeak pipe boots, woven valleys, and Snow Country ridge vent system integrated Phases 2 + 3 (Northwest, Southwest, Southeast Wings - 4600 sq ft): -Repeat of full roof system protocol, extended to entire perimeter slope system -13 dormer cheek walls stripped and re-sided in custom cedar shake -All peaks capped with Owens Corning ProEdge hip/ridge for tight finish -Seamless system integration across multiple roof planes with hips, valleys, and historical details preserved 💡 Prognosis: This spiritual sanctuary now has a roof that honors its architectural soul — and protects it for decades to come. No band-aids. No shortcuts. Just structural clarity, water-tight transitions, and historically respectful detailing. COSM is now covered — literally and symbolically.
Light Wood

Select Below To View Areas

  • Wooden Panels_edited.jpg

    4' x 8' Plywood Roofing Sheets

    Copper

    Primed cedar shakes

    Owens Corning Duration shingles

  • Wooden Panels_edited.jpg

    Repairs

    Inspections & Assessments

    Waterproofing

    Leak detection & patching.

    Installation

After Media

Before Media

Progress Media

Wooden Panels

Project Notes

📸 These photos show:

  • Multi-phase tear-off and rebuild across gambrel and mansard roofs

  • Re-decking with ¾” plywood over original plank system

  • Dormer siding reinstalled with fresh cedar shakes

  • Hand-bent flashing and woven valleys for long-term weatherproofing

  • Vinyl soffit and fascia upgrades that modernize without compromising heritage

This project required craftsmanship and restraint — balancing preservation with performance. Every dormer, ridge, and seam now tells the story of careful reconstruction done right.

Preventative Care – Do’s & Don’ts

Do:

  • Use full-coverage underlayments on complex roof geometries

  • Replace dormer siding in tandem with flashing and roof transitions

  • Match new materials to historical details when restoring older buildings

🚫 Don’t:

  • Rely on original decking in structures over 75 years old — overlay with CDX

  • Reuse old flashing or ridge vents — always fabricate new to fit geometry

  • Patch dormers without addressing their siding and underlayment systems

Other Projects

Commercial Building Renovation – 40 Garden Street, Poughkeepsie, NY | Multi-Floor Soffit, Break Room & Basement Build-Out

Commercial Building Renovation – 40 Garden Street, Poughkeepsie, NY | Multi-Floor Soffit, Break Room & Basement Build-Out

Red Mango & Nestlé Toll House Commercial Build-Out – New City, NY

Red Mango & Nestlé Toll House Commercial Build-Out – New City, NY

Do you want this job quoted with local laws & code costs included?

Get Your Project
Started Today

bottom of page