
First-Time Homeowners’ Whole-Home Renovation – Pawling, NY
Select Area
Client Review
Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.
Client Name

Project Overview
May 2, 2021
Jun 24, 2021

Select Below To View Areas


Vinyl plank flooring

Pressure Washing
Framing
Repairs
21 point inspection
Drywall Repairs
Inspections & Assessments
Waterproofing
Installation
Trim & Moldings
Appliance Installation
Electrical
Plumbing
Taping
Painting
Flooring
Countertops
Cabinetry
After Media
Before Media
Progress Media

Project Notes
📸 These photos show:
Half-wall conversion into a modern bar counter
Unified upper-floor vinyl plank flooring and open-plan connection
Basement excavation for egress window installation
Framing and finish work for the new bathroom and relocated laundry
Septic access riser installation for clean future service
Light, modern finishes tying together each floor for continuity
This build was about flow, practicality, and peace of mind — taking an outdated space and giving it both freedom and function for first-time homeowners ready to make it their own.
Preventative Care – Do’s & Don’ts
✅ Do:
Keep the egress window well clear of leaves and debris
Stay proactive with septic maintenance — pump every 3–5 years using the new riser access
Use gentle floor cleaners to preserve waterproof plank finish
🚫 Don’t:
Overload the bar-top counter with excess weight
Ignore drainage or pump system noises — they’re early warning signs
Let humidity linger in the basement bathroom — use venting regularly
Other Projects

.png)



